Correct Power-system Sequencing :Firming first
Correct Power-System Sequencing: Firming First
A reliable, affordable, low-emissions grid is built by sequencing infrastructure correctly. Firming is not
a backup — it is part of the primary system.
STEP SYSTEM ELEMENT PURPOSE
1 Define system requirements MW, MWh, ramp rates, inertia, seasonal balance
2 Build firm dispatchable capacity 24/7 reliability, peak coverage, contingency response
3 Secure firming fuel Gas supply or renewable fuels for dispatch certainty
4 Scale renewables within firming envelope Low-cost energy without destabilising prices
5 Targeted transmission upgrades Connect firming, renewables, and load efficiently
6 Decarbonise firming fuels (CRT) Maintain stability while eliminating fossil inputs
Key Insight: When renewables are built ahead of firming, scarcity sets prices and emergency
interventions replace proper dispatch. When firming is built first, renewables reduce prices as
intended.
CRT role: Carbon Recycling Technology decarbonises firming fuels last — after system stability is
secured — using the same dispatch logic, assets, and reliability standards.